The Nancheng Viaduct, constructed by Longxing Urban Construction, is the earliest project to start construction among the Nancheng projects.
After more than four months, the Nancheng Viaduct has already achieved initial results.
The Nancheng Elevated Highway is not only the earliest project started in Nancheng, but also the top priority of Nancheng’s transportation network, which is directly related to the transportation connection between Nancheng New District and the city center.
Thinking of this, Song Qingyou asked Li Wan to drive directly to the Nancheng Elevated Highway.
Surprisingly, when Song Qingyou and Li Wan arrived at their destination, as soon as they got off the car, they saw Cheng Qi and more than a dozen project personnel standing at the entrance of the project department, looking like they were waiting for someone.
Seeing the scene in front of him, Song Qingyou couldn't help but frowned.
How did Cheng Qi know she was coming here?
"Hello, Special Assistant Song" Cheng Qi saw Song Qingyou getting out of the car, raised his legs and walked up.
"Mr.
Cheng, what a coincidence."
Song Qingyou replied lightly, looking at him with a hint of meaning in his eyes.
Coming to Nancheng this time was a last-minute decision.
Who can tell her why Cheng Qi seemed to have been waiting for a long time.
Moreover, if she remembered correctly, during the project construction period, the company assigned managers to supervise and manage the project.
As Cheng Qi is the chairman of the company, it's a bit of a coincidence that she can meet him just by chance.
"Assistant Song, what a coincidence.
I happened to come over today to check on the progress of the project, and I didn't expect to run into you."
"I just came here to take a look.
Don't pay too much attention to it.
Everyone is busy with their own business."
Song Qingyou said calmly, looking at the row of managers and technical workers standing at the door.
Hearing this, everyone glanced at Cheng Qi subconsciously and did not move.
Cheng Qi heard Song Qingyou's words and said with a smile: "Assistant Song, they are all the core technical personnel of this project and know the Nancheng Elevated Project quite well.
Since you are here today, I might as well take this opportunity to tell you Report on the project status.”
"In that case, let's go in."
After Song Qingyou finished speaking, he took the safety helmet handed over by Cheng Qi, put it on, and walked into the construction site first.
"Song Special Assistant, the first phase of the Nancheng Elevated Project officially started four months ago.
The total budgeted investment is 186.3 billion, with a total length of about 46 kilometers and consisting of 6 routes.
I will ask Mr.
Wang to give you the specific construction status. introduce."
Wang Jiang, who was accompanying him, heard Cheng Qi's words and introduced himself: "Song Special Assistant, hello, I am Wang Jiang, the chief engineer of this project.
Our current location is at the Qinghe Road intersection in Nancheng.
The first phase of the Nancheng Elevated Project is mainly Connect the north entrance and exit of the highway to the Qinghe Road Elevated, the south entrance to the highway to the Outer Ring Road Elevated, the airport entrance to the highway and the South Ring Elevated to improve and intensify the Nancheng Expressway network and enhance the rapid traffic capacity of the Nancheng New District and the city center.
Improve and alleviate the traffic pressure in our city to a certain extent.”
"I saw on the planning map that there is a green plant under the elevated structure.
How do you deal with the daily water and rainwater discharge from the green plants?"
"When constructing the Qinghe Road Elevated and Outer Ring Road Elevated, we have set up an unattended automatic sprinkler irrigation system in advance for the green space below.
Because S City has sufficient rainwater and a well-developed water system, we plan to collect and purify elevated rainwater and pump it from along the elevated River water is used to solve the water source problem of the sprinkler irrigation system.
At the same time, in order to protect the safety of drinking water sources, we collect rainwater through pipes into specially built reservoirs, and then discharge them to the municipal pipe network after engineering treatment
.
: